Comprehensive Project List of Economic Development Projects

 

The third project list is a comprehensive list of ready-to-go economic development projects that are planned by sponsors to be implemented over the next 12 to 18 months (i.e., through the end of 2022). As noted above, this third list includes the designated EDA and ARC priority projects indicated above.

All of the projects in this list are economic development projects, programs, and activities that Southern Tier West suggests should be implemented so as to implement the Goals and Objectives of this CEDS. Readers of the CEDS should note certain overarching “themes” for regional economic development in this third list (e.g., infrastructure development, technology, labor force, etc.). Readers of the CEDS also are encouraged to view the projects in the project list in terms of prior related investments.

The Comprehensive Project List has five sections: Allegany County Projects, Cattaraugus County Projects, Chautauqua County Projects, Regional Projects, and Seneca Nation of Indians Projects. There is no explicit ranking of projects within any of these five sections; however, the highest priority projects within each section are highlighted in yellow and appear at the top of the list in each of the five sections. Also, projects generally are grouped together with other similar projects within each of the five sections (e.g., infrastructure projects are grouped together, etc.). Otherwise, there is no other ordering or ranking within a given section, or as between the five sections.

The project list identifies projects by project name, project sponsor, total project cost and funding sources and amounts (if known), projected private sector for-profit jobs to be created and/or retained as a consequence of the implementation of the project (if known), and projected date of implementation (if known). (Exception: Projects sponsored by the Seneca Nation of Indians may involve creation or retention of jobs provided by the Seneca Nation of Indians or one of its affiliated corporations, which may or may not be thought of as being public sector jobs.)

Projects included in this project list include – but are not limited to – those projects that propose the use of either or both ARC or EDA funds as project funding source(s).

Key:
C = Private sector for-profit Jobs projected to be created as a consequence of the project
R = Private sector for-profit Jobs projected to be retained as a consequence of the project
FTE = Full Time Equivalent
TBD or N/A = to be determined or not applicable or available at time of CEDS publication

The titles of the highest priority projects are highlighted in yellow.

Alfred Center for Technology Transfer Project
Sponsor: Allegany County
Total cost: TBD; funding sources: TBD
Job impact: 120 C / 10 R
Date: 2020

Alfred University Integrated Manufacturing Center Project
Sponsor: Alfred University
Job impact: 7 C
Total cost: $10,050,000; funding sources: TBD
Date: 2020

Workforce Development Through Refrigeration Training Enhancements
Sponsor: Alfred State College of Technology – HVAC Training Program
Total Cost: $214,000; funding sources: ARC $150,000, applicant $64,000
Job Impact: 120 C
Date: 2021

Crossroads Development Infrastructure System Project
Sponsor: Allegany County
Job impact: 500 C / 10 R
Total cost: TBD
Date: 2020

Crossroads Business Park Foreign Trade Zone / Sub-zone Project
Sponsor: Allegany County Industrial Development Agency
Total Cost: $45,000; funding sources TBD
Job impact: 20 C, 5 R
Date: 2021

VanCampen Industrial Park Access Road Project; CR 20 S-Curve Site
1.3 priority
Sponsor: Allegany County IDA
Total Cost: $750,000; funding sources TBD
Job impact: 50 C
Date: 2021

Railroad Spur and Switch Gears Project; CR 20 S-Curve Site
1.6 priority
Sponsor: Allegany County IDA
Total Cost: $500,000; funding sources TBD
Job impact: 50 C
Date: 2021

Crossroads Water Tank Project
4 priority
Sponsor: Allegany Crossroads Development LDC
Total Cost: $1,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Friendship to Amity Sewer Line Project
Sponsor: Allegany Crossroads Development LDC
Total Cost: $8,500,000; funding sources TBD
Job impact: TBD
Date: 2021

Crossroads Business Park Hotel Development Project
Sponsor: Allegany County Industrial Development Agency
Total Cost: $15,000,000; funding sources TBD
Job impact: TBD
Date: TBD

Crossroads Electric Rebuild Project
Sponsor: Allegany County IDA
Total Cost: $38,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Broadband/Fiber Optic Project
Sponsor: Southern Tier West RPDB
Total Cost: $20,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Alfred Village Water Supply Upgrade Project
Sponsor: Village of Alfred
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Alfred Business Development Assistance Project
Sponsor: Village of Alfred
Total Cost: $250,000; funding sources TBD
Job impact: TBD
Date: 2021

Alfred Development and Implementation of Revitalization Plan and Initiatives
Sponsor: Village of Alfred, public/private partnership
Total Cost: $30,000; funding sources TBD
Job impact: TBD
Date: 2021

Alfred Main and University Streets Improvements Project
Sponsor: Village of Alfred
Total Cost: $625,000; funding sources TBD
Job impact: TBD
Date: 2021

Alfred Reconstruction of Route 244
Sponsor: Town and Village of Alfred
Total Cost: $1,625,000; funding sources TBD
Job impact: TBD
Date: 2021

Alfred Sewer System Project: C9-6601-04-00
Sponsor: Village of Alfred
Total Cost: $1,509,000; funding sources TBD
Job impact: TBD
Date: 2021

Alfred Wastewater Treatment Plant Upgrade Project
Sponsor: Village of Alfred
Total Cost: $5,000,000; funding sources TBD
Job impact: 1000 R
Date: 2021

Alfred Wastewater Treatment Sludge Digester Renovation Project
Sponsor: Village of Alfred
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Sugar Hill Industrial Park Development Project, Phase 2
Sponsor: Sugar Hill Development Corporation
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Sugar Hill Water Tank Project
Sponsor: TBD
Total Cost: $900,000; funding sources TBD
Job impact: 20 C, 50 R
Date: 2021

Allentown School Renovation and Reuse Project
Sponsor: Town of Alma
Total Cost: $3,000,000; funding sources TBD
Job impact: 30 C
Date: 2021

Almond Wastewater System Improvements Project
Sponsor: Village of Almond
Total Cost: $2,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Almond Wastewater System Improvements Project with New Line from Alfred
Sponsor: Village of Almond
Total Cost: $9,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Almond Distribution Upgrade Project Phase 3
Sponsor: Village of Almond
Total Cost: $257,500; funding sources TBD
Job impact: TBD
Date: 2021

Almond Water Storage and Distribution System Project Phase 2
Sponsor: Village of Almond
Total Cost: $3,492,000; funding sources TBD
Job impact: TBD
Date: 2021

Almond Water Districts
Sponsor: Town of Almond
Total Cost: $75,000; funding sources TBD
Job impact: TBD
Date: 2021

Almond Water Treatment Plant and Storage Upgrade
Sponsor: Village of Almond
Total Cost: $922,000; funding sources TBD
Job impact: TBD
Date: 2021

Almond Water Project
Sponsor: Village and Town of Almond
Total Cost: $600,000; funding sources TBD
Job impact: TBD
Date: 2021

Andover Main Street Project
Sponsor: Village of Andover
Total Cost: $250,000; funding sources TBD
Job impact: TBD
Date: 2021

Andover New Water Treatment Plant and Upgrade Project
Sponsor: Village of Andover
Total Cost: $4,500,000; funding sources TBD
Job impact: TBD
Date: 2021

Andover Public Water Project
Sponsor: Village of Andover
Total Cost: $11,200,000; funding sources TBD
Job impact: TBD
Date: 2021

Andover Wastewater System Improvements Project
Sponsor: Village of Andover
Total Cost: $1,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Andover Water Source Project
Sponsor: Village of Andover
Total Cost: $3,299,000; funding sources TBD
Job impact: TBD
Date: 2021

Andover Public Sewer System
Sponsor: Village of Andover
Total Cost: $1,950,000; funding sources TBD
Job impact: TBD
Date: 2021

Andover Sewer System Project:C9-6695-01-00
Sponsor: Village of Andover
Total Cost: $18,827,000; funding sources TBD
Job impact: TBD
Date: 2021

Angelica School Restoration/Renovation Project
Sponsor: New LDC
Total Cost: $2,250,000; funding sources TBD
Job impact: 30 C
Date: 2021

Belfast Water Distribution Project
Sponsor: Town of Belfast
Total Cost: $2,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Belmont Water Distribution System Upgrade Project
Sponsor: Village of Belmont
Total Cost: $405,827; funding sources TBD
Job impact: TBD
Date: 2021

Belmont Water Distribution Project
Sponsor: Village of Belmont
Total Cost: $900,000; funding sources TBD
Job impact: TBD
Date: 2021

Belmont School Restoration/Renovation Project
Sponsor: New LDC
Total Cost: $9,800,000; funding sources TBD
Job impact: 100 C
Date; 2021

Birdsall General Mercantile Project
Sponsor: Town of Birdsall and private businesses
Total Cost: $300,000; funding sources TBD
Job impact: TBD
Date: 2021

Bolivar 4″ Water Main Replacement Project
Sponsor: Village of Bolivar
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Bolivar Village New Water Storage and System Project
Sponsor: Village of Bolivar
Total Cost: $788,500; funding sources TBD
Job impact: TBD
Date: 2021

Bolivar Water System Upgrade Project
Sponsor: Village of Bolivar
Total Cost: $790,000; funding sources TBD
Job impact: TBD
Date: 2021

Bolivar Sewer System Line Replacement and Relining Project
Sponsor: Village of Bolivar
Total Cost: $750,000; funding sources TBD
Job impact: TBD
Date: 2021

Bolivar Water Reservoir Renovation Project
Sponsor: Village of Bolivar
Total Cost: $700,000; funding sources TBD
Job impact: TBD
Date: 2021

Bolivar -Richburg Pleasant Valley Water Project
Sponsor: Village of Bolivar and Village of Richburg and Towns adjacent.
Total Cost: $5,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Canaseraga Water Distribution System Project
Sponsor: Village of Canaseraga
Total Cost: $2,039,915; funding sources TBD
Job impact: TBD
Date: 2021

Canaseraga Downtown Revitalization: Downtown Shopping Opportunities Development
Sponsor: Village of Canaseraga, Private/Public Partnership
Total Cost: $50,000; funding sources TBD
Job impact: TBD
Date: 2021

Canaseraga Sewer System Project:C9-6607-02-00
Sponsor: Village of Canaseraga
Total Cost: $1,660,000; funding sources TBD
Job impact: TBD
Date: 2021

Canaseraga Trail System Development Project
Sponsor: Town of Burns, Town of Grove, Finger Lakes Trail, Interested parties
Total Cost: $500,000; funding sources TBD
Job impact: TBD
Date: 2021

Caneadea Sewer System Project:C9-6667-02-00
Sponsor: Town of Caneadea
Total Cost: $1,557,000; funding sources TBD
Job impact: TBD
Date: 2021

Centerville Establish Wind Turbine Cooperative
Sponsor: Town of Centerville
Total Cost: $10,000; funding sources TBD
Job impact: TBD
Date: 2021

Cuba Hospital/Stonebridge Crossing [Independent & Assisted Living Complex]
Sponsor: Cuba Hospital
Total Cost: $15,000,000; funding sources TBD
Job impact: 35 C, 240 R
Date: 2021

Cuba Landmark Connections to Greenway Project
Sponsor: Village of Cuba
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Cuba Main Street Enhancement Project
Sponsor: Village of Cuba
Total Cost: $702,000; funding sources TBD
Job impact: TBD
Date: 2021

Cuba Wastewater Collection and Treatment System Improvements Project
Sponsor: Village of Cuba
Total Cost: $72,100; funding sources TBD
Job impact: TBD
Date: 2021

Cuba Water System Upgrade Project
Sponsor: Village of Cuba
Total Cost: $896,820; funding sources TBD
Job impact: TBD
Date: 2021

Cuba Watermain Replacement Project
Sponsor: Village of Cuba
Total Cost: $1,500,000; funding sources TBD
Job impact: TBD
Date: 2021

Friendship Wastewater Treatment Plant Upgrade Project
Sponsor: Town of Friendship
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Friendship Downtown Revitalization Project
Sponsor: Town of Friendship
Total Cost: $400,000; funding sources TBD
Job impact: 100 C
Date: 2021

Friendship Water Project
Sponsor: Friendship Water District
Total Cost: $1,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Friendship Water Source and Distribution System Project
Sponsor: Town of Friendship
Total Cost: $1,030,000; funding sources TBD
Job impact: TBD
Date: 2021

Friendship Water Hydrant Replacement
Sponsor: Town of Friendship
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Friendship/Cuba Multi-Tenant Facility Project
Sponsor: ACCORD Corporation
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Hume Water Project
Sponsor: Town of Hume
Total Cost: $3,787,000; funding sources TBD
Job impact: TBD
Date: 2021

Hume N. Genesee/W. Main Water Lines
Sponsor: Town of Hume
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Hume Sewer System Project:C9-6627-01-00
Sponsor: Town of Hume
Total Cost: $3,787,000; funding sources TBD
Job impact: TBD
Date: 2021

Richburg Drinking Water System Improvements Project
Sponsor: Village of Richburg
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Richburg Waterline Replacement Project
Sponsor: Village of Richburg
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Rushford Wastewater System Project
Sponsor: Town of Rushford
Total Cost: $2,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Rushford Lake District Wastewater System Project
Sponsor: Town of Rushford
Total Cost: $4,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Rushford School Building Reuse Project
Sponsor: Town of Rushford
Total Cost: $1.750,000; funding sources TBD
Job impact: 30 C
Date: 2021

Swain – Canaseraga Sewer Mainline and Collection System Project
Sponsor: Allegany County IDA
Total Cost: $2,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Sewer Collection System Update Project
Sponsor: Village of Wellsville
Total Cost: $2,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Sewer System Project:C9-6694-01-00
Sponsor: Village of Wellsville
Total Cost: $7,733,250; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Wastewater Treatment Plant Update Project
Sponsor: Village of Wellsville
Total Cost: $13,700,000; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Water Distribution System Extensions on Wightman Road and Truax Area
Sponsor: Town of Wellsville
Total Cost: $1,500,000; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Water Distribution System Update Project
Sponsor: Village of Wellsville
Total Cost: $3,500,000; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Water Supply Extension Project
Sponsor: Town of Wellsville
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Water Treatment Plant Update Project
Sponsor: Village of Wellsville
Total Cost: $500,000; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Mainline Bridge Obstruction Remediation Project
Sponsor: Southern Tier Extension Railroad Authority
Total Cost: TBD; funding sources: NYS DOT, WNYP RR, other sources TBD
Job impact: TBD
Date: 2021

Wellsville Morningside District Wastewater Collection System Project
Sponsor: Town of Wellsville
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Route 417 East Wastewater System Project
Sponsor: Town of Wellsville
Total Cost: $2,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Village New Water Storage Project
Sponsor: Village of Wellsville
Total Cost: $1,177,000; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Water Distribution System Extension Project
Sponsor: Town of Wellsville
Total Cost: $867,106; funding sources TBD
Job impact: TBD
Date: 2021

Wellsville Water Project 2 Distribution System Extension Project
Sponsor: Town of Wellsville
Total Cost: $1,192,450; funding sources TBD
Job impact: TBD
Date: 2021

West Almond Trail Upgrade Project
Sponsor: NYSDEC
Total Cost: $1,456,000; funding sources TBD
Job impact: TBD
Date: 2021

Alle-Catt Wind Farms Windmill Project
Sponsor: Invenergy
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Access to Self Sufficiency and Economic Security Project
Sponsor: ACCORD Corporation
Total Cost: $129,000; funding sources TBD
Job impact: TBD
Date: 2021

Agricultural Marketing Opportunities Project
Sponsor: Private/Public Partnership
Total Cost: $100,000; funding sources TBD
Job impact: TBD
Date: 2021

Agricultural Public Outreach Programs
Sponsor: Cornell Cooperative Extension
Total Cost: $100,000; funding sources TBD
Job impact: TBD
Date: 2021

Allegany County Small Business RLF Project
Sponsor: Allegany County Office of Development
Total Cost: $400,000; sources: GOSC Small Cities
Job impact: TBD
Date: 2022

Biomass Recover for Farms and Recycled Materials
Sponsor: Cornell Cooperative Extension
Total Cost: $50,000; funding sources TBD
Job impact: TBD
Date: 2021

Creation of a Tourism Awareness Program
Sponsor: Greater Allegany County Chamber of Commerce and Office of Tourism
Total Cost: $10,000; funding sources TBD
Job impact: TBD
Date: 2021

Food Processing Facility for Organic/Sustainable Farming
Sponsor: Private/Public Partnership
Total Cost: $125,000; funding sources TBD
Job impact: TBD
Date: 2021

Low Tech Incubator in a Hub Community
Sponsor: Allegany County IDA
Total Cost: $400,000; funding sources TBD
Job impact: TBD
Date: 2021

Reuse of Existing Underutilized Facilities and Properties [Brownfields]
Sponsor: Allegany County Office of Development
Total Cost: $150,000; funding sources TBD
Job impact: TBD
Date: 2023

STAR Career Pathways Project
Sponsor: Literacy West
Total Cost: $150,000; funding sources TBD
Job impact: 60 C
Date: 2021

Zero Energy Manufactured Home Assembly Facility Project
Sponsor: Alfred State College/Allegany County IDA
Total Cost: $2,500,000; funding sources TBD
Job impact: 30 C
Date: 2021

Local Waterfront Revitalization Program for Towns and Villages on the Genesee River
Sponsor: Jones Memorial Hospital
Total Cost: $20,000; funding sources TBD
Job impact: TBD
Date: 2021

Barrelhouse Convention Center Project
Sponsor: Allegany Trails
Total Cost: $8,000,000; funding sources TBD
Job impact: TBD
Date: 2021

Genesee River Wilds Pocket Parks Project
Sponsor: Genesee River Wilds, Inc.
Total Cost: $400,000; funding sources TBD
Job impact: TBD
Date: 2021

Genesee River Wilds Park Project
Sponsor: Genesee River Wilds, Inc.
Total Cost: $300,000; funding sources TBD
Job impact: TBD
Date: 2021

Creation of a New State Forest in Allegany County
Sponsor: NYSDEC
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

Allegany County DPW Office/Shop Project
Sponsor: Allegany County DPW
Total Cost: $3,500,000; funding sources TBD
Job impact: TBD
Date: 2021

Bridge Upgrades
Sponsor: Allegany County DPW
Total Cost: TBD; funding sources TBD
Job impact: TBD
Date: 2021

CNG Fleet Conversion & Fueling Facilities Project
Sponsor: Alfred State College & Allegany County
Total Cost: $500,000; funding sources TBD
Job impact: 10 C
Date: 2021

Olean/Portville (Town of Portville) Water Line Extension Route 417 Project
Sponsor: Town of Portville
Total cost: TBD; funding sources: EDA, others TBD
Job impact: TBD
Date: 2020

Allegany (Town) I-86 Exit 24 Interchange Wastewater Infrastructure Development Project
Sponsor: Town of Allegany
Total cost: TBD; funding sources: Cattaraugus County, Town of Allegany, HUD
Job impact: 100 C
Date: 2020

Little Valley (Village) Wastewater Infrastructure Project
Sponsor: Village of Little Valley
Total cost: TBD; funding sources: EDA, TBD
Job impact: TBD
Date: 2020

Salamanca (City) State Park Avenue Upgrade Project
Sponsor: City of Salamanca
Total cost: $4,000,000; funding sources: TBD
Job impact: TBD
Date: 2020

Ellicottville (Town) Regional Water Project
Sponsor: Town of Ellicottville
Total cost: $1,340,000; funding sources: TBD
Job impact: 196 C
Date: 2020

Olean Business Incubation Center Project Phase 2
Sponsor: Olean Business Development Corporation
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

African American Cultural Center Project
Sponsor: Olean Business Development Corporation
Total Cost: $300,000; funding sources: ARC $150,000, applicant $150,000
Job Impact: 2 C
Date: 2021

Pathways to Success: Seneca Nation Arts and Crafts Tourism Initiative
Sponsor: Seneca Iroquois National Museum
Total Cost: $78,832; funding sources: ARC $39,416, applicant $39,416
Job Impact: 10 C
Date: 2021

Historic Hollywood Theater Project
Sponsor: Gowanda’s Historic Hollywood Theater, Ltd.
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Allegheny River Canoe & Kayak Launch Project
Sponsor: City of Olean
Total cost: $94,000; funding sources: City of Olean, Cattaraugus County
Job Impact: 6 C
Date: 2021

BOA Downtown Redevelopment Project
Sponsor: City of Olean
Total cost: $2.5 million; funding sources: NYS ESD, Restore NY, Private Developer, City of Olean
Job Impact: 80 C
Date: 2020

North Union Street Streetscape
Sponsor: City of Olean
Total cost: $900,000; funding sources: DRI
Job Impact: TBD
Date: 2019-2020

West State Street Streetscape Improvements
Sponsor: City of Olean
Total cost: $1,600,000; funding sources: DRI
Job Impact: TBD
Date: 2021

South Union Street Gateway Corridor
Sponsor: City of Olean
Total cost: $1,400,000; funding sources: DRI
Job Impact: TBD
Date: 2020

Walkable Olean Phase III (East State Street)
Sponsor: City of Olean
Total cost: $1,200,000; funding sources: DRI
Job Impact: TBD
Date: 2020

Oak Hill Park Improvements
Sponsor: City of Olean
Total cost: $350,000; funding sources: DRI
Job Impact: TBD
Date: 2020-2022

Allegheny River Syphon Decommissioning & Pump Station Construction Project
Sponsor: City of Olean
Total cost: $1,082,000; funding sources: NYSDEC, City
Job Impact: TBD
Date: 2021

Comprehensive Water Distribution System Plan
Sponsor: City of Olean
Total Cost: $40,000; funding sources: NYS ESD, Cattaraugus County
Job Impact: TBD
Date: 2020

Downtown Revitalization & Rehabilitation Fund
Sponsor: City of Olean & Olean Business Development
Total cost: $600,000
Job Impact: TBD
Date: 2020

Olean Downtown Revitalization Project Phase 2
Sponsor: Olean Business Development Corporation
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Seneca Allegany Boulevard Access Road Project
Sponsor: City of Salamanca
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Ashford (Town) Water System Upgrade Project
Sponsor: Town of Ashford
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Forness Park Pedestrian and Bicycle Path Project
Sponsor: City of Olean
Total cost: $300,000; funding sources: NYS, NYS OPRHP, NYS DOT
Job impact: TBD
Date: 2020

Portville Transportation Improvement Project
Sponsor: Town and Village of Portville
Total cost: TBD; funding sources: US DOT ($2,000,000), other sources TBD
Job impact: TBD
Date: 2020

Onoville Marina Expansion Project
Sponsor: Cattaraugus County
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Empire State Brands Integrated Hops & Barley Processing Facility Project
Sponsor: Chautauqua County IDA/Chautauqua County/City of Dunkirk
Job Impact: TBD
Total Cost: $15 Million
Date: 2021

Ripley Gateway Project
Sponsor: Chautauqua County
Total Cost: TBD
Job Impact: TBD
Date: 2021

Chautauqua County Agriculture Sector Diversification Initiative
Sponsor: Chautauqua County IDA/Chautauqua County/Cornell Cooperative Extension
Job Impact: TBD
Total Cost: $4 Million
Date: 2021

Dunkirk Coal Power Plant Redevelopment (NRG Re-Use)
Sponsor: Chautauqua County IDA/Chautauqua County/City of Dunkirk
Job Impact: TBD
Total Cost: TBD
Date: 2022

Northern Chautauqua County Industrial Park Expansion Project
Sponsor: Chautauqua County
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2021

Develop Right-sized Industrial Spec Building
Sponsor: Chautauqua County
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2022

Establish World-Class Center for Advanced Production
Sponsor: Chautauqua County
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2022

Chautauqua Lake Sewer Integration Project
Sponsor: Chautauqua County Sewer Agency / Chautauqua County
Total cost: $40,000,000 to $60,000,000; funding sources: USDA RD, EDA, ARC, NYS ESD, NYS DEC, NYS EFC, NYS
DHCR, local public
Job impact: TBD
Date: 2020

Northern Chautauqua County Water District Project
Sponsor: Chadwick Bay Regional Development Corporation
Total cost: $36,000,000; funding sources: TBD
Job impact: TBD
Date: 2020

Dunkirk Harbor Dredging and Breakwall Extension Project
Sponsor: Chautauqua County
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Edgewood Redevelopment (remediation/demolition/rehab) Project
Sponsor: County IDA
Total cost: $13 million; funding sources: TBD ($3 million public, $10 million private investment)
Job impact: 50 – 100 jobs created
Date: 2020

Ripley Interstate Site Infrastructure Project
Sponsor: Chautauqua County IDA
Total cost: TBD; funding sources: TBD
Job impact: 300 C – 600 C
Date: 2020

Education and Training Fund Program
Sponsor: UPMC Chautauqua
Total Cost: $200,000; funding sources: ARC $100,000, WCA Foundation $52,500, CRCF $26,000, applicant
$21,000
Job Impact: 70 C
Date: 2021

Increased Talent Pipeline for Software Developers
Sponsor: Jamestown Community College
Total Cost: $325,101.27; funding sources: ARC $149,996.24, private sector fees $94,500, applicant $80,605.03
Job Impact: 1 C
Date: 2021

Chautauqua Institution Master Plan Implementation Project
Sponsor: Chautauqua Institution/Chautauqua County
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2019

CARTS Workforce Transportation Project
Sponsor: Chautauqua County/WIB
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2019

Multi-Modal Tourism Transportation Hub at Jamestown’s McCrea Point Project
Sponsor: City of Jamestown/Jamestown Renaissance Corporation
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Battery Point Villas Project
Sponsor: Erie Land Development
Total Cost: $13,000,000; funding sources: TBD
Job Impact: 5 created
Date: 2020

Chadwick Bay Hospitality Project
Sponsor: Erie Land Development
Total Cost: $10,000,000; funding Sources: ESD, other sources TBD
Job Impact: 50 created
Date: 2020

Hispanic Success Center Project
Sponsor: Jamestown Community College
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Making It Real: Girls & Manufacturing Project
Sponsor: Dream It Do It WNY
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Mason Industrial Park Expansion Project
Sponsor: Chautauqua County IDA
Total cost: $2,500,000; funding sources: TBD
Job impact: TBD
Date: 2020

SUNY Fredonia 2020 Project
Sponsor: SUNY Fredonia
Total cost: TBD; funding sources: TBD
Job impact: 373 C
Date: 2020

Jamestown Furniture Mart Redevelopment Project
Sponsor: Gebbie Foundation
Total Cost: $19,000,000; funding sources: NYS $1,500,000, state/federal/county historic tax credits/mortgage
tax abatements/county sales tax abatements $2,200,000, private equity $4,267,600, private debt
$11,000,000
Job impact: 70 created, 350 retained
Date: 2020

Riverfront Development Property Acquisition Project
Sponsor: City of Jamestown
Total Cost: $1,400,000; funding source: NYS $1,400,000
Job impact: TBD
Date: 2020

Westfield West Main Water/Sewer Extension Project
Sponsor: Town of Westfield / Village of Westfield
Total cost: Water $1,195,600 / Sewer TBD; funding sources: TBD
Job impact: TBD R / 20 C
Date: 2020

Westfield Business Park Project
Sponsor: Westfield Development Corporation
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Routes 5 & 20, Irving Area Commercial Development Project
Sponsor: Chautauqua County IDA
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Traffic Calming/Streetscape Enhancements Project (from 2nd to Fluvana Avenue on Washington Avenue in Jamestown, NY)
Sponsor: City of Jamestown/Jamestown Renaissance Corporation/NYS DOT
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Barcelona Harbor to Chautauqua Institution Shared Use Trail Project
Sponsor: Chautauqua County Department of Planning and Economic Development
Total cost: $3 – 5 million; funding sources: TBD
Job impact: 40 – 50 C
Date: 2020

Wright Park Improvements Phase 2 Project
Sponsor: City of Dunkirk
Total Cost: TBD
Job Impact: TBD
Date: 2020

Point Gratiot Park Beach Improvements Project
Sponsor: City of Dunkirk
Total Cost: $214,500; funding source: NYS EFC/DEC WQIP
Job Impact: TBD
Date: 2020

Pier Improvements Project
Sponsor: City of Dunkirk
Total Cost: $1,850,000; funding source: NYS ESD
Job Impact: TBD
Date: 2020

Central Connections Marketing and Signage Project
Sponsor: City of Dunkirk and Village of Fredonia
Total Cost: $650,000; funding source: NYS ESD
Job Impact: TBD
Date: 2020

North County Harbor Study Project
Sponsor: Chautauqua County
Total Cost: TBD
Job Impact: TBD
Date: 2020

STEL Housing Project
Sponsor: STEL
Total Cost: $16,000,000; funding source: NYS HCR and STEL
Job Impact: TBD
Date: 2020

Lake Shore Dr. Mixed Use Project
Sponsor: City of Dunkirk
Total Cost: $2,500,000; funding source: ESD and Private
Job Impact: TBD
Date: 2020

Route 5 Complete Streets Project
Sponsor: City of Dunkirk
Total Cost: $1,500,000; funding source: TBD
Job Impact: TBD
Date: 2020

Central Avenue Façade and Building Improvements Project
Sponsor: City of Dunkirk
Total Cost: $500,000; funding source: TBD
Job Impact: TBD
Date: 2020

Early Child Care Education
Sponsor: Dunkirk City School District
Total Cost: TBD; funding source: TBD
Job Impact: TBD
Date: 2020

Sherman (Village) Wastewater Treatment Plant Upgrade Project
Sponsor: Village of Sherman
Total cost: TBD; funding sources: NYS EFC, other sources TBD
Job impact: TBD
Date: 2020

E. Lake Road Water Extension Project
Sponsor: Town of Westfield
Total cost: $2,500,000; funding sources: TBD
Job impact: TBD
Date: 2020

Westfield Water System Improvements Project
Sponsor: Village of Westfield
Total cost: $2,378,900; funding sources: TBD
Job impact: TBD R / TBD C
Date: 2020

Phase II – Implementation of the Northern Chautauqua County LWRP
Sponsor: Chautauqua County
Total cost: $100,000; funding sources: TBD
Sponsor: TBD
Date: 2020

Welch Field Facilities Upgrade Project
Sponsor: Village of Westfield
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Recreational Dredging Project (Sunset Bay at Cattaraugus Creek)
Sponsor: Chautauqua County
Total cost: TBD; funding sources: USACE, Chautauqua County, other sources TBD
Job impact: TBD
Date: 2020

Recreational Dredging Project (Dunkirk Harbor)
Sponsor: Chautauqua County
Total cost: TBD; funding sources: USACE, Chautauqua County, other sources TBD
Job impact: TBD
Date: 2020

Lister Street (Jamestown) Closure and Rail Siding Installation Project
Sponsor: STERA / City of Jamestown
Total cost: $663,950; funding sources: NYS DOT ($168,950), other sources TBD
Job impact: TBD
Date: 2020

Passenger Railroad Feasibility Study and Business Plan Project – WNY Regional Rail Corridor
Sponsor: City of Jamestown
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Westfield Train Station Passenger Stop Project
Sponsor: Westfield Development Corporation
Total cost: TBD; sources: TBD
Job impact: 10 – 20 C
Date: 2020

Lucy Trail Boardwalk Project
Sponsor: Village of Celoron
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Grape Discovery Center Phase III Building Expansion Project
Sponsor: Concord Grape Belt Heritage Association, Inc.
Total cost: $671,540; funding sources: TBD
Job impact: TBD
Date: 2020

Bemus Point (Village) Casino Renovation Project
Sponsor: Village of Bemus Point
Total cost: $477,000; funding sources: TBD
Job impact: 25 C / 150 R
Date: 2020

Westfield Main Street Revitalization – Phase II Project
Sponsor: Chautauqua Opportunities, Inc. / Village of Westfield
Total cost: $250,000; funding sources: TBD
Job impact: TBD
Date: 2020

Westfield Pedestrian Hub and Municipal Parking Lot Upgrade Project
Sponsor: Village of Westfield
Total cost: $424,925; funding sources: TBD
Job impact: TBD
Date: 2020

Rural Areas Revitalization Project
Sponsor: Chautauqua Opportunities, Inc.
Total cost: $200,000; funding sources: TBD
Job impact: TBD
Date: 2020

Chautauqua County Education Coalition Project
Sponsor: Chautauqua County Chamber of Commerce / Manufacturers Association of the Southern Tier /
Cummins Jamestown Engine Plant / and others
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Chadakoin River Business Strategy
Sponsor: Chautauqua County Industrial Development Agency/ Gebbie Foundation/ City of Jamestown/ BPU
Total cost: $55,000; funding sources: CCIDA, Gebbie Foundation, City of Jamestown, multiple private partners
Job impact: TBD
Date: 2020

Gateway Lofts Project
Sponsor: Southern Tier Environments for Living/ Community Helping Hands
Total cost: $36,000,000; funding sources: DHCR, NYS OMH, SHOP, Federal Historic credits, State Historic credits,
Brownfield credits, CIF
Job impact: TBD
Date: 2020

Arcade Building Redevelopment Project
Sponsor: Home Leasing
Total cost: TBD
Job impact: TBD
Date: 2020

City of Jamestown Marketing & Branding Initiative
Sponsor: City of Jamestown
Total cost: $75,000 plus campaign costs; funding sources: City of Jamestown/JLDC
Job impact: TBD
Date: 2020

Unite North Main Gateway Corridor Project
Sponsor: Chautauqua County Industrial Development Agency/ Gebbie Foundation/ City of Jamestown/
BPU/JRC
Total cost: TBD
Job impact: TBD
Date: 2020

Riverwalk Illumination Project
Sponsor: City of Jamestown
Total cost: TBD; funding sources: DRI
Job impact: TBD
Date: 2020

US Route 219 Supplemental EIS Funding Project
Sponsor: NYS DOT
Total cost: $2,500,000; funding sources: TBD (NYS DOT, US DOT, NYS ESD)
Job impact: TBD
Date: 2019

US Route 219 Construction Project
Sponsor: NYS DOT
Total cost: TBD; funding sources: TBD (NYS DOT, US DOT)
Job impact: TBD
Date: 2020

Broadband Development Project (EDA Public Works Funding)
Sponsor: Southern Tier West RP & DB
Total cost: TBD; funding sources: TBD
Job impact: N/A
Date: 2020

STEDO Revolving Loan Fund Recapitalization Project
Sponsor: Southern Tier Enterprise Development Organization, Inc.
Total Cost: $300,000; funding sources: ARC $150,000, private sector loan recipients $150,000
Job Impact: 22 C
Date: 2021

STEDO Small Business RLF Capitalization Project
Sponsor: Southern Tier Enterprise Development Organization, Inc.
Total cost: $10,000,000; funding sources: NYS ESD ($5,000,000), Local Private ($5,000,000)
Job impact: 80 C
Date: 2020

Commercial Bio‐Refinery Resource Assessment Project
Sponsor: Seneca Trail Resource Conservation & Development
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Food Aggregation Facility Implementation Project
Sponsor: Southern Tier West RP & DB
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Dream It Do It Western New York Project
Sponsor: Manufacturers Association of the Southern Tier
Total cost: $300,000; funding sources: NYS ESD (TBD), foundations (TBD); Private (TBD)
Job impact: TBD
Date: 2020

Rail Siding and Interchange Access Project
Sponsor: Southern Tier Extension Railroad Authority
Total cost: TBD; funding sources: TBD
Job impact: TBD
Date: 2020

Railroad Rehabilitation Project
Sponsor: Southern Tier Extension Railroad Authority
Total cost: $15,000,000; funding sources: TBD (EDA, NYS DOT, FRA, Private)
Job impact: 50 C
Date: 2020

Site Development Planning Project Phase 1
Sponsor: Southern Tier West RP & DB
Total cost: TBD; funding sources: TBD
Job impact: N/A
Date: 2020

Transload Facility Project Phase 1
Sponsor: Southern Tier Extension Railroad Authority
Total cost: TBD; funding sources: TBD (EDA, NYS DOT, FRA, Private)
Job impact: 10 + C
Date: 2021